Glossary entry (derived from question below)
أنجليزي term or phrase:
lineation
عربي translation:
تخطيط / رسم خطي
Added to glossary by
Amany Zakaria
Nov 8, 2023 18:26
6 mos ago
14 viewers *
أنجليزي term
lineation
أنجليزي إلى عربي
التقنية/الهندسة
علم الميكانيك \ الهندسة الميكانيكية
2. Erection of steel structures.
Appendix: general layout of foundation.
1) Setting out of foundation
a. Check and review drawing dimensions and site measurements before setting out.
b. Coordinate with construction party to define horizon reference and reference level, and perform (((((lineation))))) accordingly.
c. In case of any interfering matters during construction, perform thorough check and close coordination with construction staff before taking any measurements.
Notifications:
a) Reserve proper access for vehicles
b) No interfering objects exist in system height direction
c) The existences and placements of parking system’s posts, building’s columns, cabinet and fire hydrant doesn’t influence each other
d) No conflicts between post position and drainage trench.
e) 180mm minimum distance has to be left from wall to post center for frame installation and maintenance of BDP when installed indoor.
f) Construction can only be commenced when tolerance of diagonal distances < ±5mm during (((((lineation))))).
Appendix: general layout of foundation.
1) Setting out of foundation
a. Check and review drawing dimensions and site measurements before setting out.
b. Coordinate with construction party to define horizon reference and reference level, and perform (((((lineation))))) accordingly.
c. In case of any interfering matters during construction, perform thorough check and close coordination with construction staff before taking any measurements.
Notifications:
a) Reserve proper access for vehicles
b) No interfering objects exist in system height direction
c) The existences and placements of parking system’s posts, building’s columns, cabinet and fire hydrant doesn’t influence each other
d) No conflicts between post position and drainage trench.
e) 180mm minimum distance has to be left from wall to post center for frame installation and maintenance of BDP when installed indoor.
f) Construction can only be commenced when tolerance of diagonal distances < ±5mm during (((((lineation))))).
Proposed translations
(عربي)
5 +1 | تخطيط / رسم خطي | Besho Maher |
5 | تحديد المواقع | Motaz Fahmy |
4 | التمثيل الخطي | Islam Sakr |
Proposed translations
+1
47 دقائق
Selected
تخطيط / رسم خطي
4 KudoZ points awarded for this answer.
Comment: "شكرا"
2 دقائق
التمثيل الخطي
.
Note from asker:
شكرا |
4 دقائق
تحديد المواقع
-
Note from asker:
شكرا |
Reference comments
13 ساعات
Reference:
Lineation وضع خطوط على الأرض تحدد أماكن الحفر بدقة وبدء البناء
Note from asker:
شكرا |
Something went wrong...